ECNS John Archer (CVN-01)

From NSwiki, the NationStates encyclopedia.
Jump to: navigation, search
ECNS John Archer (CVN-01)
USSNimitz.jpg
Ordered: 19 December 1982
Laid Down: 13 October 1983
Launched: 29 April 1985
Commissioned: 28 April 1986
Decommissioned: expected 2049
Status: Active in service as of 2025
Homeport: Edward City DC
General Characteristics
Displacement: 110,000 to 120,000 tons full load
Length: Overall: 370 m
Waterline: 350 m
Beam: Overall: 75 m
Waterline: 42 m
Draft: Maximum Navigational: 11.3 m
Limit: 12.5 m
Propulsion: 2x Nuclear Reactors
4x Maxwell Steam Turbines
270,000 shp
Speed: 33+ knots (60+ km/h)
Range: unlimited
Complement: Ship's Company: 3,300
Air wing: 2.500
Armament: 30 surface-to-air missiles
18 close-in weapons system
Armour: top secret
Aircraft carried: 115 Eurofighter Typhoon
5 H-60

ECNS John Archer (CVN-01) is a supercarrier in the Edward City Navy. It is one of the largest warships in the URF.

The keel of the John Archer was laid down 13 October 1983 by Edwardia Shipbuilding in Edward City DC, Mallorca, and she was commissioned 2 April 2025 by President Albert Mainzer. The ship is named for John Archer, the 10th President of Edward City who led the country into a series of reforms wich helped to end with the economical crisis that the country was suffering at the time.