Zaire's severely dilapidated transportation infrastructure is perhaps the major constraint on the country's economic development. The country's large size and the physical limitations imposed by its topography are major factors in the underdevelopment of the transportation system, but poor management by inefficient parastatals and corruption are primarily responsible for the sector's daunting deficiencies. During colonial times, the transportation system was well developed to transport food products from Kivu and minerals from Shaba (then Katanga Province) to the Atlantic Coast for export. The transportation infrastructure has been neglected since independence, however.

Roads traditionally played a secondary role in the Zairian transportation network, behind railroads and waterways. A network of approximately 145,000 kilometers of roads exists in Zaire, although the country's vast interior is virtually devoid of roads. Only 2,500 kilometers are paved, originally including the 350-kilometer Kinshasa-Matadi link, which is nearly thirty years old and was not built for the heavy loads it carries. By 1992 there were reports that only about forty kilometers of the Kinshasa-Matadi road were still paved. The road from Kikwit to Kinshasa and the links among the mineral centers of Lubumbashi, Kolwezi, and Likasi in Shaba also are paved. In the early 1990s, the entire road network had slipped into a state of serious disrepair; a journey of 150 kilometers could take up to twenty-four hours.

The situation has obvious implications for the movement of both passengers and in particular freight, 80 percent of which reportedly moved by private road transport in 1988. This vital service is, however, in jeopardy in the early 1990s. Trucks, spare parts, and fuel are in short supply, and the condition of most roads (especially secondary and rural roads) ranges from appalling to unusable. Local residents and entrepreneurs, religious groups, and some large companies have attempted to maintain some roads but with limited success nationwide.

Official passenger transport services in Kinshasa are also inadequate, but their unofficial, mostly unlicensed suppliers have been able to fill much of the gap. Deploying an armada of pickup trucks, covered trucks, and taxibuses, they provide half the city's public transportation, offering better service at a lower cost to the city's workers and residents.

Zaire has 5,138 kilometers of railroad in three discontinuous lines. A 366-kilometer standard-gauge (1.067 meter) line links Kinshasa with Zaire's main port of Matadi. Over 1,100 kilometers of narrow-gauge (1 meter and 0.6 meter) rail connect towns in northeast Zaire. The bulk of the system, however, consists of a network of standard-gauge lines in southeast Zaire used primarily to export minerals. International connections exist with Angola's Benguela Railway (not operating in the early 1990s), with the Zambian and South African rail systems, and with Tanzania's rail lines via a ferry across Lake Tanganyika.

The Zairian National Railroad Company (Société Nationale de Chemins de Fer Zaïrois--SNCZ) is headquartered in Lubumbashi, the regional capital of Shaba. Since 1974 SNCZ has been a state-owned company, responsible for the operation and maintenance of the rail line between Lubumbashi and Ilebo on the Kasai River. The National Transport Board of Zaire (Office National des Transports au Zaïre-- Onatra) manages the Matadi-Kinshasa line as well as transport on the Zaire River.

The railroads, too, are in desperate need of repair. Train transport is slow, cumbersome, and unreliable. Little attention has been paid the railroads since independence. The railroads are suffering from a lack of working locomotives and rolling stock as well as deteriorating railbeds. In the late 1980s, SNCZ undertook a US$75 million rehabilitation effort financed by the World Bank, the African Development Bank, and the governments of Belgium, France, and West Germany. By 1989 the project was at the half-way point in terms of committed funding. It sought to refurbish 263 kilometers of the Kinshasa-Matadi and Lubumbashi-Ilebo links. Track beds were rebuilt and new rail and cross ties installed. The plan called for the overhaul of twenty diesel locomotives and thirty- eight electric locomotives as well as for the purchase of new rolling stock and material to manufacture rail cars locally. Most of the project had been set for completion in the early 1990s, but little if any progress was expected in light of the prevailing economic chaos.

The rail and river transportation network between the copper-mining region of Shaba and the country's principal port of Matadi is called the National Route (Voie Nationale). This network is Zaire's lifeline, a 2,665-kilometer combination of railroad between Lubumbashi and Ilebo, river transport from Ilebo to Kinshasa, and rail once again between Kinshasa and the port of Matadi. (Because of rapids below Kinshasa, the river is not navigable between Kinshasa and Matadi.) It is the only route between the mining region and the ocean entirely within Zaire. This route became even more crucial after the 1,400-kilometer Benguela Railway linking Shaba to the sea via the Angolan port of Lobito was closed in 1975 because of the Angolan civil war. (In 1991 plans were underway to reopen this rail line following an agreement between Portugal and Belgium, but no further progress had been made by 1993.) Zaire once sent almost half of its exports via the Benguela Railway. Mineral shipments traveling via the National Route to Matadi can take as long as two months and average about forty-five days. Moreover, because the load on the route is limited, Zaire has been forced to rely heavily on South African rail lines for between 33 percent and 40 percent of its mineral exports.

Inland waterways have traditionally been an important mode of internal transportation, but in the early 1990s, river transport was limited because the marking of navigable channels had been neglected, and barges were both old and in short supply.

The Congo River is the most significant of the country's rivers, and both passenger and freight ships ply the navigable section between Kinshasa and Kisangani. In late 1993, however, there were reports that riverboats had ceased operating between Kisangani and Kinshasa because of lack of fuel and spare parts.

Ports are limited because Zaire, nearly landlocked, has only a tiny coastline of just forty kilometers. Matadi on the lower Zaire River is Zaire's principal port and handles 90 percent of the country's nonmineral exports. Efficient cargo and passenger transportation at the Atlantic port of Boma, at Matadi, and between Ilebo on the Kasai River and Kinshasa are constrained by lack of equipment, the need for better charting and maintenance along the two rivers, and the fact that Matadi is a relatively shallow port and thus not accessible by large vessels. Donor countries have attempted to improve service at the ports of Kinshasa and Matadi, and a new deep-water port at Banana on the Atlantic also was at one time under consideration but has been abandoned given the economic situation prevailing in the early 1990s.

The cut-off of aid to Zaire and the deterioration of the economy in the early 1990s have halted economic development efforts, and shipping, like other forms of transport, is in serious disarray. According to one report, Zaire's maritime company has been forced to sell off all its boats.

Note: This article comes from Zaire: A Country Study, which is in the public domain. Full credit goes to the authors of it.